Eyüpsultan Historical Police Station Building Restoration Application Work

http://gursoyinsaat.com.tr/wp-content/uploads/2021/10/karakol.mp4 This parcel is 127,00 m 2 and the foundation settlement area of the structure which is being planned is 90,00 m 2 . The planned structure consists of 1 Basement + 1 ground floor + 1 normal floor; totally 3 floors. Employer Façade  Rehabilitation  Application Work Date 2021 – 2022 Place İstanbul, Eyüpsultan İlçesi […]

Eyüpsultan Mosque and Façade Rehabilitation Application Work

The works given below were completed within the scope of the project. 1995 m Working axis 3 neighborhood 27 plot 284 pcs. structure 116 pcs. smö and registered old door 13 avenue and street Employer Eyup Municipality Project Type Façade  Rehabilitation  Application Work Date 2020 – 2021 Place İstanbul Previous Next

Akan İplik Factory Construction Project

https://www.youtube.com/watch?v=FcyDc3Mx65A –  Construction of reinforced concrete factory building with 12741,25m² utility area (2 basement, 1 ground floor, 2 normal floor). – Having 2565m² foundation settlement -1919m² hard ground and landscaping work Employer AKAN GROUP Project Type INDUSTRIAL FACTORY CONSTRUCTION Date 2021-2022 Place İSTANBUL Previous Next